Warm sunlight grazes a limestone arched entry with a wood door, stone steps and a mature live oak beside the approach.

This Holiday Season, Georgetown's Newest Downtown Stops Sit a Block Off the Square

"We want people to go off and enjoy the rest of our downtown, because our downtown is 52 blocks, but most people only think about the nine blocks of the square," Downtown and Tourism Director Kim McAuliffe told Community Impact in late October.

This holiday season shows what she means. The courthouse lights, the Stroll and the parade follow the schedule Georgetown already knows. The changes are a block or two off the square: a backyard under a pecan tree on Rock Street, a beer garden back in business on Austin Avenue, and new signs meant to point people beyond the square's nine blocks. The way in hasn't changed yet either. The Austin Avenue bridges north of downtown stay at one lane each way for every holiday event on the calendar.

The Calendar Holds Steady

Here is the 2026 season on and around the square, in order:

  1. Second Saturday Market Days, Nov. 14. This is the last market of the year. Hours run 9 a.m. to 4 p.m.
  2. Lighting of the Square, Friday, Nov. 27. Entertainment runs from 5:30 to 6:30 p.m. on the courthouse's east steps. The switch flips around 6 p.m., and the lights stay on every night through Jan. 1.
  3. Small Business Saturday and the Coffee & Cocoa Crawl, Nov. 28. The crawl starts at 10 a.m. at 505 S. Austin Ave. and runs until 2 p.m. Advance tickets are $25 and include a keepsake mug and samples at downtown businesses. The first 300 shoppers get a free tote.
  4. The 45th Christmas Stroll, Dec. 4 through 6. Hours are 4 to 9:30 p.m. Friday, 10 a.m. to 9:30 p.m. Saturday, and 10 a.m. to 4 p.m. Sunday. The parade steps off Saturday, Dec. 5, at 10 a.m. More than 200 artisan and boutique vendors set up, along with Santa's Village.

The Stroll keeps last year's three-day format and daily hours. The Downtown Georgetown Association has given it a new theme, "Hometown Christmas Stroll: A Season to Gather." If you have a parade-day plan from last year, the timing still works. The new material for this year is on the blocks around the square.

A Pecan Tree on Rock Street

The clearest example of McAuliffe's 52 blocks is at 1005 S. Rock St. Owners Madison and Jackson Vacek ran Rose & Dagger Coffee Co. as a coffee truck in the backyard of a yellow historic house. On Sept. 5 they moved the coffee shop into the house itself, according to Community Impact. Along with lattes, teas and refreshers, the shop sells art, flowers and candles made by local residents.

The backyard, known as The Grounds, now has three food trucks under a large pecan tree. Community Impact's September business roundup and its report on the Churros ATX move describe what each one serves:

  • Sanford Sourdough Bakery opened its trailer on July 1. The Round Rock bakery sells San Francisco-style loaves, lunch sandwiches and soup, sourdough starters, and frozen take-and-bake goods.
  • El Hombre Tacos arrived in late July, when owner Eric Thornell parked one of his catering trucks here for good. The signature Hombre Taco is steak and melted cheese on a flour tortilla.
  • Churros ATX moved over from the Tasty Trails food truck park on Aug. 1. Owner Cesar Velasco fills churros with dulce de leche and serves a churro loop with ice cream, along with chicken and beef empanadas.

All four businesses opened or moved in between July and September, so The Grounds is going into its first holiday season. On a Stroll Saturday, it puts bread, tacos, coffee and dessert one address south of the vendor tents. Rock Street is also one of the corridors the city's 2024 Downtown Master Plan names for redevelopment. Here, small business owners got there before the plan did.

Monument Cafe Reopens a Garden It Closed in 2012

At the north end of downtown, Monument Cafe at 500 S. Austin Ave. added two things on Oct. 8: a beer garden with outdoor seating and craft beer on tap, and a market with grab-and-go food and pickup orders from the full menu. The garden isn't new to the property. Co-owner Cristy Schuler told Community Impact that a beer garden came with the building when the cafe moved there in 2008. She closed it in 2012 and spent the last two years working to bring it back.

Location makes this one useful on Lighting night. The Austin Avenue lot at Fifth Street, which Visit Georgetown describes as near Monument Cafe, is on the city's free parking list. It's just north of the Sixth-to-Ninth stretch of Austin Avenue that closes for the evening. Park there, eat in the garden, and walk south to the courthouse steps.

For a sit-down dinner closer to the square, Encantada Cocina + Cantina at 205 W. Second St. is on the city's downtown dining list and takes reservations through its own site.

Signs Pointing Off the Square

The city is now building infrastructure to send people where Rose & Dagger and Monument already are. Directional signs installed around 2004 are being replaced with new ones in the city's poppy motif and its blue and red colors, as Community Impact reported. The new set includes signs that point drivers to free lots and the garage, pedestrian signs for spots like the Williamson Museum, the Georgetown Palace Theatre and public restrooms, and interactive kiosks with directory maps and event calendars. Installation was expected to start in late October, with all the signs up by mid-to-late November. If that holds, they'll be in place for the Lighting crowd.

Street patios will probably take longer. A two-year pilot program would let businesses in and around the square build enclosed seating on sidewalks and in parking spaces. The ordinance had its first reading on the council calendar for Oct. 27, with final adoption targeted for November. Businesses can already submit applications so construction can start once the program is approved. Even so, the Stroll comes just a few weeks after the target adoption date, so new patios may not be ready by then.

The bigger pieces are further out. A second downtown garage with 450 spaces is in design at Ninth and Main. Construction is set to start in 2027, with opening expected in early 2029. Wider sidewalks around the historic square and along Austin Avenue are also in design, with construction expected in the next one to two years.

The Bridge Stays One Lane Through New Year's

The rehabilitation of the 1940 Austin Avenue bridges over the San Gabriel River, paid for through the 2021 Mobility Georgetown bond, affects every holiday trip from the north. The city's Lighting of the Square notice confirms that the bridges are down to one lane in each direction and suggests eventgoers consider other routes.

The city's project page still lists a Spring 2026 finish, but the city's more recent ClearGov project timeline has replaced that date. According to that timeline:

  • Oct. 9: Crews started setting formwork for the new southbound deck on the south bridge.
  • Dec. 28: The southbound decks on both bridges are scheduled to be finished. Traffic then moves onto them while work starts on the northbound side.
  • July 16, 2027: Substantial completion.

The Dec. 28 traffic shift comes three weeks after the Stroll. That means the market, the Lighting, the cocoa crawl and all three Stroll days happen with the bridges at one lane each way, and the next phase of work begins right after the holidays. The city's project page also warns about occasional overnight full closures of the bridges.

Parking and Closures on Lighting Night

On Nov. 27, Austin Avenue closes from Sixth to Ninth streets from 6 a.m. to 10 p.m. Main Street closes from Sixth to Ninth, and Seventh and Eighth streets close between Austin and Church, for about the same hours. Rock, Church and Ninth streets stay open. The city's free parking list for the holiday events includes:

  • The lot at Seventh and Rock
  • The Austin Avenue lot at Fifth Street
  • Martin Luther King Jr. Street at Seventh and Eighth
  • The garages at Sixth and Main and at Fourth and Rock

The city garage opened in November 2025 with 315 spaces on five levels, so this is its second holiday season. Neither the city's event listings nor the Downtown Georgetown Association's Stroll page mentions a shuttle this year. Rock Street stays open during the closures, so the Seventh and Rock lot works for trips to both The Grounds and the courthouse steps.

Marion keeps track of downtown Georgetown projects like the new signs, the patio pilot and the second garage. If you'd like to know where your home stands as downtown changes, Marion Lamantia can help. Request Your Free Home Valuation here.

Discover the Difference

As a trusted real estate specialist with years of experience and a proven track record, Marion is here to make your buying or selling journey seamless and successful. Contact Marion today for personalized, expert guidance every step of the way.

Follow Me on Instagram